Products Center
undefined
undefined
+
  • undefined
  • undefined

Water Environment Remediation Project for the Downstream Section of the Fenxi River in Wanjiang, Dongguan

[Construction Method]: Robotic Arm Vibration Method

[Pile Type Selected]: H-BZ-450-II, with a pile length of 12–15 meters.

Hydraulic Revetment

Product Details

  • 产品描述
    • Commodity name: Water Environment Remediation Project for the Downstream Section of the Fenxi River in Wanjiang, Dongguan

    <p> [Construction Method]: Robotic Arm Vibration Method </p> <p> [Pile Type Selected]: H-BZ-450-II, with a pile length of 12–15 meters. </p>

    [Construction Method]: Robotic Arm Vibration Method

    [Pile Type Selected]: H-BZ-450-II, with a pile length of 12–15 meters.

Product Inquiry

Action
Submit