Products Center
undefined
+
  • undefined

Green Space and River Channel Remediation Project on Hejing Road, Liwan District, Guangzhou

[Construction Method]: Robotic Arm Vibration Method

【Pile Type Selected】: H-BZ-300-I (bark-imitation pile with color spraying), pile length 5 meters.

Hydraulic Revetment

Product Details

  • 产品描述
    • Commodity name: Green Space and River Channel Remediation Project on Hejing Road, Liwan District, Guangzhou

    <p> [Construction Method]: Robotic Arm Vibration Method </p> <p> 【Pile Type Selected】: H-BZ-300-I (bark-imitation pile with color spraying), pile length 5 meters. </p>

    [Construction Method]: Robotic Arm Vibration Method

    【Pile Type Selected】: H-BZ-300-I (bark-imitation pile with color spraying), pile length 5 meters.

Product Inquiry

Action
Submit