Products Center
Zengjiang River Comprehensive Water Conservancy Improvement Project (Chuxi River Barrage–Shitan Bridge Section)
[Construction Method]: Robotic Arm Vibration Method
【Pile Type Selection】: H-BZ-300-Type I (bark-imitation pile), pile length 3–6 meters.
Category:
Hydraulic Revetment
Product Details
- 产品描述
-
- Commodity name: Zengjiang River Comprehensive Water Conservancy Improvement Project (Chuxi River Barrage–Shitan Bridge Section)
<p> [Construction Method]: Robotic Arm Vibration Method </p> <p> 【Pile Type Selection】: H-BZ-300-Type I (bark-imitation pile), pile length 3–6 meters. </p>
[Construction Method]: Robotic Arm Vibration Method
【Pile Type Selection】: H-BZ-300-Type I (bark-imitation pile), pile length 3–6 meters.
Keywords:
Product Inquiry
Please leave your email address, and our specialists will get in touch with you as soon as possible!