Products Center
undefined
undefined
undefined
+
  • undefined
  • undefined
  • undefined

Wanjiang Water Conservancy Improvement and Renovation and Water Environment Remediation Project (Phase II)

[Construction Method]: Excavator with vibratory hammer + mechanical pilot hole drilling (pilot hole first, then pile driving)

【Pile Type Selected】: H-BZ-450-II, pile length 12–14 meters.

Hydraulic Revetment

Product Details

  • 产品描述
    • Commodity name: Wanjiang Water Conservancy Improvement and Renovation and Water Environment Remediation Project (Phase II)

    <p> [Construction Method]: Excavator with vibratory hammer + mechanical pilot hole drilling (pilot hole first, then pile driving) </p> <p> 【Pile Type Selected】: H-BZ-450-II, pile length 12–14 meters. </p>

    [Construction Method]: Excavator with vibratory hammer + mechanical pilot hole drilling (pilot holes first, then pile driving)

    【Pile Type Selected】: H-BZ-450-II, pile length 12–14 meters.

Jogol Building Materials

Product Inquiry

Action
Submit