Wanjiang Water Conservancy Improvement and Renovation and Water Environment Remediation Project (Phase II)
[Construction Method]: Excavator with vibratory hammer + mechanical pilot hole drilling (pilot hole first, then pile driving)
【Pile Type Selected】: H-BZ-450-II, pile length 12–14 meters.
Category:
Hydraulic Revetment
Product Details
- 产品描述
-
- Commodity name: Wanjiang Water Conservancy Improvement and Renovation and Water Environment Remediation Project (Phase II)
<p> [Construction Method]: Excavator with vibratory hammer + mechanical pilot hole drilling (pilot hole first, then pile driving) </p> <p> 【Pile Type Selected】: H-BZ-450-II, pile length 12–14 meters. </p>
[Construction Method]: Excavator with vibratory hammer + mechanical pilot hole drilling (pilot holes first, then pile driving)
【Pile Type Selected】: H-BZ-450-II, pile length 12–14 meters.
Keywords:
Jogol Building Materials
Product Inquiry
Please leave your email address, and our specialists will get in touch with you as soon as possible!