Featured Cases
Guided by the corporate mission of “Focusing on customer needs, providing competitive prefabricated green building materials and services, continuously creating and delivering value,” and adhering to the business philosophy of “Adapting to trends, keeping promises with integrity, pursuing continuous innovation, and manufacturing with precision,” Zhuo Gongren will keep forging ahead with relentless innovation and steady progress. We will leverage innovative technologies, superior products, and efficient services to support the company’s strategic development, and persistently strive to meet customer needs and build brand value.
Ecological Riparian Zone on the South Bank of the Jiulong River Basin (High-tech Zone Section) in Zhangzhou High-tech Industrial Development Zone
[Construction Method]: Robotic Arm Vibration Method
[Pile Type Selected]: H-BZ-300-II, pile length 9 meters
Flood and Drought Prevention Construction Project for the Resettlement Area of Immigrants in Sijihong Town, Yuanjiang
[Construction Method]: Robotic Arm Vibration Method
【Pile Type Selected】: H-BZ-250-II, pile length 6 meters
Luo Ding City Urban Area Drainage and Flood-Resilience Improvement Project (Phase I) – Hydraulic Engineering
[Construction Method]: Robotic Arm Vibration Method
【Pile Type Selected】: H-BZ-300-II, pile length 6–8 meters
Infrastructure Supporting Works for the Initial Phase of the Guangzhou–Zhanjiang Industrial Relocation Cooperation Park – Flood Control and Drainage
[Construction Method]: Robotic Arm Vibration Method
【Pile Type Selected】: H-BZ-450-III, pile length 5–9 meters
Dongguan Tongshe Reservoir Safety Compliance Project
[Construction Method]: Robotic Arm Vibration Method
【Pile Type Design】: CFZ 500 (180) – Type B
Pile length: 6–10 meters. (Small pile body, compact construction equipment, minimal site footprint.)
Bank Protection Project for the Baima Daitang Tributary of the Shigu River in Dongguan City
[Construction Method]: Robotic Arm Vibration Method
【Pile Type Design】: CFZ 750 (340)-Type A, pile length 9–13 meters
Construction Project for the Practical Training Base at the Zhenjiang Campus of Guangdong Songshan Vocational and Technical College
[Construction Method]: Robotic Arm Vibration Method + Water-Injected Pilot Hole Drilling
【Pile Type Design】: CFZ 750 (340)-Type A, pile length 10 meters
Riverbank Protection Project for the Tangshang Group of Lianhe Village, Sanjiang Town, Xinhui District, Jiangmen
[Construction Method]: Robotic Arm Vibration Method (Model 470 Crawler Pile Driver + Model 350 Hydraulic Vibratory Hammer)
【Pile Type Design】: CFZ 750 (340)-Type A, pile length 9–13 meters
Phase I of the Xinhe Project in Chang’an, Binhai Bay New Area, Dongguan
[Construction Method]: Step-by-Step Hammering Method (Step-by-Step Frame + 16-ton Hydraulic Impact Hammer)
【Pile Type Design】: CFZ 750 (340)-A and B types, pile length 12–21 meters
Landscape Enhancement Project for the Four Rivers and Two Streams in Nancheng, Dongguan
[Construction Method]: Suspended Impact Method (75-ton crawler crane + 10-ton hydraulic impact hammer)
[Pile Type Selected]: CFZ 750 (340)-Type A, pile length 9–13 meters.
Fengkai Guwei River Remediation Project in Zhaoqing City
[Construction Method]: Robotic Arm Vibration Method (450-Type Excavator + 350-Type Hydraulic Vibratory Hammer)
【Pile Type Design】: CFZ 750(340)-Type A, pile length 5–7 meters.
Foundation Pit Support Project for Shunde Guangzheng Experimental Middle School
[Construction Method]: Hammering Method (16-ton Hydraulic Environmental Protection Hammer)
【Pile Type Design】: CFZ 750 (340)-Type A, pile length 15 meters.