Products Center

Rural Landscape Enhancement Project for Xige Village, Binhai New Area, Maoming City

[Construction Method]: Robotic Arm Vibration Method

【Pile Type Selected】: H-BZ-250-II, pile length 6 meters

Details >

Comprehensive Traffic and Spatial Renovation Project for Binhe Road in Nancheng, Dongguan (Shigu Section)

[Construction Method]: Robotic Arm Vibration Method + Floating Platform

[Pile Type Selected]: H-BZ-450-II, pile length 9 meters.

Details >

Ecological Restoration Project for the Damaixi Low-Flow Drainage Channel

[Construction Method]: Excavator with Vibration Hammer (Local Pilot Hole Drilling)

[Pile Type Selected]: H-BZ-300-II, pile length 8 meters

Details >

Ecological Riparian Zone on the South Bank of the Jiulong River Basin (High-tech Zone Section) in Zhangzhou High-tech Industrial Development Zone

[Construction Method]: Robotic Arm Vibration Method

[Pile Type Selected]: H-BZ-300-II, pile length 9 meters

Details >

Flood and Drought Prevention Construction Project for the Resettlement Area of Immigrants in Sijihong Town, Yuanjiang

[Construction Method]: Robotic Arm Vibration Method

【Pile Type Selected】: H-BZ-250-II, pile length 6 meters

Details >

Luo Ding City Urban Area Drainage and Flood-Resilience Improvement Project (Phase I) – Hydraulic Engineering

[Construction Method]: Robotic Arm Vibration Method

【Pile Type Selected】: H-BZ-300-II, pile length 6–8 meters

Details >

Infrastructure Supporting Works for the Initial Phase of the Guangzhou–Zhanjiang Industrial Relocation Cooperation Park – Flood Control and Drainage

[Construction Method]: Robotic Arm Vibration Method

【Pile Type Selected】: H-BZ-450-III, pile length 5–9 meters

Details >

Dongguan Tongshe Reservoir Safety Compliance Project

[Construction Method]: Robotic Arm Vibration Method

【Pile Type Design】: CFZ 500 (180) – Type B

Pile length: 6–10 meters. (Small pile body, compact construction equipment, minimal site footprint.)

Details >

Bank Protection Project for the Baima Daitang Tributary of the Shigu River in Dongguan City

[Construction Method]: Robotic Arm Vibration Method

【Pile Type Design】: CFZ 750 (340)-Type A, pile length 9–13 meters

Details >

Construction Project for the Practical Training Base at the Zhenjiang Campus of Guangdong Songshan Vocational and Technical College

[Construction Method]: Robotic Arm Vibration Method + Water-Injected Pilot Hole Drilling

【Pile Type Design】: CFZ 750 (340)-Type A, pile length 10 meters

Details >

Riverbank Protection Project for the Tangshang Group of Lianhe Village, Sanjiang Town, Xinhui District, Jiangmen

[Construction Method]: Robotic Arm Vibration Method (Model 470 Crawler Pile Driver + Model 350 Hydraulic Vibratory Hammer)

【Pile Type Design】: CFZ 750 (340)-Type A, pile length 9–13 meters

Details >

Phase I of the Xinhe Project in Chang’an, Binhai Bay New Area, Dongguan

[Construction Method]: Step-by-Step Hammering Method (Step-by-Step Frame + 16-ton Hydraulic Impact Hammer)

【Pile Type Design】: CFZ 750 (340)-A and B types, pile length 12–21 meters

Details >

< 1234 > proceed page