Rural Landscape Enhancement Project for Xige Village, Binhai New Area, Maoming City
[Construction Method]: Robotic Arm Vibration Method
【Pile Type Selected】: H-BZ-250-II, pile length 6 meters
[Construction Method]: Robotic Arm Vibration Method + Floating Platform
[Pile Type Selected]: H-BZ-450-II, pile length 9 meters.
Ecological Restoration Project for the Damaixi Low-Flow Drainage Channel
[Construction Method]: Excavator with Vibration Hammer (Local Pilot Hole Drilling)
[Pile Type Selected]: H-BZ-300-II, pile length 8 meters
[Construction Method]: Robotic Arm Vibration Method
[Pile Type Selected]: H-BZ-300-II, pile length 9 meters
[Construction Method]: Robotic Arm Vibration Method
【Pile Type Selected】: H-BZ-250-II, pile length 6 meters
[Construction Method]: Robotic Arm Vibration Method
【Pile Type Selected】: H-BZ-300-II, pile length 6–8 meters
[Construction Method]: Robotic Arm Vibration Method
【Pile Type Selected】: H-BZ-450-III, pile length 5–9 meters
Dongguan Tongshe Reservoir Safety Compliance Project
[Construction Method]: Robotic Arm Vibration Method
【Pile Type Design】: CFZ 500 (180) – Type B
Pile length: 6–10 meters. (Small pile body, compact construction equipment, minimal site footprint.)
Bank Protection Project for the Baima Daitang Tributary of the Shigu River in Dongguan City
[Construction Method]: Robotic Arm Vibration Method
【Pile Type Design】: CFZ 750 (340)-Type A, pile length 9–13 meters
[Construction Method]: Robotic Arm Vibration Method + Water-Injected Pilot Hole Drilling
【Pile Type Design】: CFZ 750 (340)-Type A, pile length 10 meters
[Construction Method]: Robotic Arm Vibration Method (Model 470 Crawler Pile Driver + Model 350 Hydraulic Vibratory Hammer)
【Pile Type Design】: CFZ 750 (340)-Type A, pile length 9–13 meters
Phase I of the Xinhe Project in Chang’an, Binhai Bay New Area, Dongguan
[Construction Method]: Step-by-Step Hammering Method (Step-by-Step Frame + 16-ton Hydraulic Impact Hammer)
【Pile Type Design】: CFZ 750 (340)-A and B types, pile length 12–21 meters