Guided by the corporate mission of “Focusing on customer needs, providing competitive prefabricated green building materials and services, continuously creating and delivering value,” and adhering to the business philosophy of “Adapting to trends, keeping promises with integrity, pursuing continuous innovation, and manufacturing with precision,” Zhuo Gongren will keep forging ahead with relentless innovation and steady progress. We will leverage innovative technologies, superior products, and efficient services to support the company’s strategic development, and persistently strive to meet customer needs and build brand value.

Hammering method

Hammering method

The hammering method is currently a widely used pile-driving technique.

Land piling

Mast-type rack + hydraulic impact hammer (16t-20t);

Pile driving on water

Marine pile-driving vessel + guide rod hammer (or hydraulic impact hammer)

Construction Method Advantages

High penetrating power, capable of adapting to geological conditions with relatively high N-values (≤30 blows).

Suspension Impact Method

Suspension Impact Method

Applicable scenarios

The suspended impact method is suitable for construction near water bodies where the engineering geology is relatively hard and a construction interface is available.

Construction Method Advantages

It has strong penetrating power and can adapt to geological conditions with higher N-values (≤25 blows). It can be suspended for construction over a certain distance and is also suitable for construction interfaces where there are significant elevation differences on site.

Robotic Arm Vibration Method

Robotic Arm Vibration Method

Applicable scenarios

This method is generally suitable for shore-side construction involving piles with smaller specifications and shorter lengths (≤12m), in areas with relatively soft engineering geology, and where a certain construction interface is available. When the N-value is relatively high, mechanical pilot drilling can be used to assist in pile driving.

Construction Method Advantages

Pile extraction, pile feeding, and pile driving are completed in one step, ensuring fast construction.