Guided by the corporate mission of “Focusing on customer needs, providing competitive prefabricated green building materials and services, continuously creating and delivering value,” and adhering to the business philosophy of “Adapting to trends, keeping promises with integrity, pursuing continuous innovation, and manufacturing with precision,” Zhuo Gongren will keep forging ahead with relentless innovation and steady progress. We will leverage innovative technologies, superior products, and efficient services to support the company’s strategic development, and persistently strive to meet customer needs and build brand value.
Water Environment Remediation Project for the Downstream Section of the Fenxi River in Wanjiang, Dongguan
[Construction Method]: Robotic Arm Vibration Method
[Pile Type Selected]: H-BZ-450-II, with a pile length of 12–15 meters.
Tonghu Town Beautiful Township and Beautiful Waterway Project
[Construction Method]: Robotic Arm Vibration Method
【Pile Type Selected】: H-BZ-300-Type I, pile length 6–9 meters.
Green Space and River Channel Remediation Project on Hejing Road, Liwan District, Guangzhou
[Construction Method]: Robotic Arm Vibration Method
【Pile Type Selected】: H-BZ-300-I (bark-imitation pile with color spraying), pile length 5 meters.
Zengjiang River Comprehensive Water Conservancy Improvement Project (Chuxi River Barrage–Shitan Bridge Section)
[Construction Method]: Robotic Arm Vibration Method
【Pile Type Selection】: H-BZ-300-Type I (bark-imitation pile), pile length 3–6 meters.
Hammering method
The hammering method is currently a widely used pile-driving technique.
Land piling
Mast-type rack + hydraulic impact hammer (16t-20t);
Pile driving on water
Marine pile-driving vessel + guide rod hammer (or hydraulic impact hammer)
Construction Method Advantages
High penetrating power, capable of adapting to geological conditions with relatively high N-values (≤30 blows).
Suspension Impact Method
Applicable scenarios
The suspended impact method is suitable for construction near water bodies where the engineering geology is relatively hard and a construction interface is available.
Construction Method Advantages
It has strong penetrating power and can adapt to geological conditions with higher N-values (≤25 blows). It can be suspended for construction over a certain distance and is also suitable for construction interfaces where there are significant elevation differences on site.
Robotic Arm Vibration Method
Applicable scenarios
This method is generally suitable for shore-side construction involving piles with smaller specifications and shorter lengths (≤12m), in areas with relatively soft engineering geology, and where a certain construction interface is available. When the N-value is relatively high, mechanical pilot drilling can be used to assist in pile driving.
Construction Method Advantages
Pile extraction, pile feeding, and pile driving are completed in one step, ensuring fast construction.
Management Project for the Yangmeizhou Section of the Xiangjiang River, a Major Tributary
[Construction Method]: Robotic Arm Vibration Method
【Pile Type Selected】: H-BZ-250-I, pile length 4–6 meters
Supporting Works and Water-Saving Renovation Project for the West Diversion Irrigation District in Shanwei City’s Urban Area
[Construction Method]: Robotic Arm Vibration Method
【Pile Type Selected】: H-BZ-300-Type I, pile length 12 meters
Standardization Project for Embankments in the Comprehensive Management of the Hanxi River Basin of the Dongyin Canal (Qiaotou Section)
[Construction Method]: Hammering Method + Floating Platform
[Pile Type Selected]: H-BZ-450-II, pile length 14 meters.
Wanjiang Water Conservancy Improvement and Renovation and Water Environment Remediation Project (Phase II)
[Construction Method]: Excavator with vibratory hammer + mechanical pilot hole drilling (pilot hole first, then pile driving)
【Pile Type Selected】: H-BZ-450-II, pile length 12–14 meters.
Parking Facility Construction and Landscape Enhancement Project for Xinji Village, Mayong
[Construction Method]: Excavator with vibratory hammer + mechanical pilot hole drilling
[Pile Type Selected]: H-BZ-450-II, pile length 9 meters